
Scaffold Handover, Inspection and Tagging
Scaffold inspection, handover and tagging are identified in Summit's capability statement as part of its operating processes. These steps sit alongside planning, competent personnel, fit for purpose equipment and disciplined work methods.
A handover should make the status and intended use of the access equipment clear to the people who rely on it. Project teams should follow the applicable site procedure, identify who is responsible for inspection, and act on any change in condition or work scope through the agreed process.
Working at heights activities must be managed in accordance with applicable WHS legislation, codes of practice, client procedures and relevant Australian Standards. The statement references applicable requirements of the AS/NZS 1891 series for working at heights activities.
The practical lesson is to treat inspection, handover and tagging as part of the work plan, not as an afterthought. The specific checks and responsibilities should be confirmed for each project and site.
General information only. Site conditions, client procedures and applicable standards determine the right approach for each job.
